A Rowan company - serving Hialeah, FL
A remodeled primary bathroom with a soaking tub and a walk-in shower
Delta · Hialeah

Delta Bathroom Remodeling in Hialeah, FL

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Hialeah
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A single-story rear room addition with tall windows and a new patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Delta Bathroom Remodeling: The Hialeah Owner’s Guide

Delta bathroom remodeling in Hialeah typically costs $9,000 – $28,000 installed, and small-bathroom projects land in the $5,000 – $12,000 range. We install Delta fixtures and Delta-compatible parts as part of full bathroom work, and we quote a flat written price before any work starts. Most Hialeah owners discover a failing Delta part the same way: a drip that starts at 2 a.m., a shower valve handle that turns a quarter-inch before it catches, or a toilet fill valve that runs for thirty seconds after every flush.

Call (888) 836-5914

Which Delta Models This Applies To

Delta’s residential line splits into a few families, and the part you need depends on which one sits in your bathroom. The single-handle shower and tub valves are the most common in Hialeah’s mid-century homes and 2000s-era condos: the Monitor 13/14 series and the older 1300/1400 bodies use a 1222 or 1225 cartridge, while the newer Monitor 17 series uses the dual-function 1700 cartridge. Pull the handle cover and look for the stamped series number on the escutcheon (the trim plate) before buying anything. Toilet fill and flush valves (the 400A and the newer 500-series) interchange differently than the shower cartridges, and faucet aerators and stems vary by model year. We match OEM Delta parts when they’re still in production and a quality aftermarket equivalent when Delta has retired the line; both get the same flat written price before install. The model number matters more than the brand name here, and a photo of the trim plate and the cartridge top lets us confirm the right part before ordering.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Signs Your Delta Bathroom Remodeling Is Failing

  • A shower handle that turns before it engages. The cartridge’s internal stop has worn, so the handle spins a few degrees before water moves. In Hialeah’s hard water, mineral scale accelerates that wear.
  • A drip from the tub spout or showerhead after shutoff. The cartridge seals have failed and water is bypassing them. Left alone, it runs up the water bill by a few dollars a day.
  • A toilet that runs after every flush. The fill valve or flapper isn’t seating. In Hialeah’s climate, the rubber flapper hardens faster than in cooler markets because of the heat and humidity in an unvented bathroom.
  • Warm or discolored water at the tap. On newer Delta thermostatic valves, a failed balancing spool can let hot water cross into the cold line. That’s a safety issue, not a nuisance.
  • A handle that drips from the base when you turn it. The O-ring under the handle has dried out. It’s a small part, but on a Delta 17 series it means pulling the trim.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A tile setter installing wall tile in a shower

Here’s how the parts and labor break out for Delta bathroom work in Hialeah, priced flat and written before anyone starts:

Service Installed Price Range
Full Delta bathroom remodel $9,000 – $28,000
Small bathroom remodel $5,000 – $12,000
Shower replacement (Delta valve and trim) $3,000 – $8,500
Tub-to-shower conversion $3,500 – $10,000
Walk-in shower installation $4,500 – $12,000
Vanity installation (Delta faucet included) $800 – $3,000

What drives the range: whether the valve body itself has to be replaced (not just the cartridge), whether the tile has to come off to access it, and the tile or surround you choose. Parts are itemized separately on the quote so you can see the Delta cartridge or valve cost next to the labor. Every install carries our written workmanship warranty and the 365-Day Done Right Promise: if it isn’t done right, we make it right.

DIY or Call Us?

A few things are safe to check on your own. Shut the water off at the angle stops under the sink or behind the toilet, then look at the cartridge top for the model stamp. That’s a flashlight-and-a-photo job, and no tools beyond a screwdriver. The line sits at the valve body: on a Delta single-handle valve, a cartridge that’s seized in the body can crack the housing when forced, and a thermostatic valve carries hot water under pressure and behind a wall. That’s where we come in, and it’s the point where a $40 part becomes a $400 repair. Our technicians have up to 19 years of experience and bring the right puller and the right cartridge for your model. Call (888) 836-5914 and we’ll quote it before we touch anything.

FAQs

A newly finished roof with a ridge vent and step flashing

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled family room with new windows and a window seatA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Hialeah

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Hialeah team

A local vetted partner works across Hialeah and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (888) 836-5914
Local Service Coverage

Request a Free Estimate in Hialeah

Tell us what you need - Rowan Construction Group Hialeah responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Call Now - 24/7 Dispatch