







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Bathroom Remodel Costs in Hialeah, FL - Including the Step Most Quotes Leave Out
Bathroom remodel costs in Hialeah run about $9,000 to $28,000 for most projects, with small bathrooms landing between $5,000 and $12,000 and full gut jobs with a layout change climbing to $52,000. Call (888) 836-5914 and we’ll give you a flat written price before any work starts. But first, the number most Hialeah quotes underestimate: removing 1960s-era tile here usually exposes a substrate that has to be rebuilt before new tile can go down. That step runs $1,200 to $3,500, and if it isn’t in your first quote, it becomes a change order later.

Why Hialeah Bathrooms Cost More Than the First Quote Says
Behind the original pastel tile in a 1960s Hialeah bathroom, there’s often a Portland-cement scratch coat applied directly to the CBS block wall. No Schluter. No RedGard. No waterproof membrane of any kind. The tile was bonded straight to the masonry.
When that tile comes off, the substrate is structurally sound but not waterproof. Miami-Dade’s current code requires a waterproof membrane before new tile is set, so the wall has to be flattened, prepped, and membrane-coated before a single new tile goes up. This isn’t a surprise we spring at the end. It belongs in the first written price, and under Clause 1 of The Haven Standard, that’s where it goes: the price is written before anyone picks up a tool.
The plumbing tells a similar story. Most Hialeah homes built between the 1950s and 1970s still have galvanized steel supply lines, corroded from the inside out. They hold pressure until you disturb them. Pull the tile and open the wall, and the lines you find are usually past saving. That’s why our written quote includes a camera or pressure inspection up front. If the supply lines need replacing, it’s $1,800 to $3,200, and it’s in the number you signed. Not a mid-project surprise.
Hialeah Bathroom Remodel Cost by Scope
| Scope of Work | Price Range |
|---|---|
| Cosmetic update (fixtures, vanity, paint, no tile) | $6,500-$12,000 |
| Mid-level gut and retile with new fixtures (substrate remediation included) | $14,000-$28,000 |
| Full gut with layout change and plumbing relocation | $28,000-$52,000 |
| Small bathroom remodel (core range) | $5,000-$12,000 |
The mid-level range is where most Hialeah jobs land. It’s also the range where the substrate step matters most: retiling over a 60-year-old scratch coat without rebuilding it is a fast way to get cracked grout and a slow leak within the first year. Our technicians have up to 19 years of experience and know the difference between a wall that’s ready for membrane and one that needs rebuilding first.

What Goes Into the Price: Fixtures, Ventilation, and Hard Water
Two line items get skipped in a lot of Hialeah estimates. Neither is optional.
- Fixture allowance: We specify Kohler vanity fixtures and shower valves at $350 to $900 for the fixture alone, and Toto toilets at $500 to $1,400. A quote built around a $150 toilet allowance produces a $150 toilet. In Hialeah’s hard municipal water, a cheap toilet or valve tends to fail inside two years, and then you’ve paid twice.
- Exhaust ventilation: Miami-Dade code requires a minimum 50 CFM exhaust fan ducted to the exterior. In these concrete-block walls, retrofitting a duct path to the outside runs $400 to $900, and it’s a permit-required item. Not an upgrade. A requirement.
That humidity is worth mentioning again. Subtropical South Florida pushes moisture into bathroom walls year-round, which is exactly why the membrane and the vent have to be right the first time. We see slow leaks and cracked grout most often in bathrooms where a previous remodel skipped one or both.
What You Get in Writing, Not on a Handshake
Rowan Construction Group Hialeah is a licensed and insured contractor, and every bathroom project comes with a flat written price, a written scope, and a written warranty before work begins. No “call for a quote.” No work proceeds on a change until the change order is signed, which is the discipline that’s kept our projects within a few percent of the agreed cost across 4,000-plus jobs. See the full trade overview on our Bathroom Remodeling page and the city-specific version at Bathroom Remodeling in Hialeah.
The 365-Day Done Right Promise is where this matters most for a bathroom. Tile work, waterproofing, and fixture installation are the three trades most likely to show a defect within the first year: grout cracking along a cold joint, a slow leak behind a shower valve, a fixture that fails early. If it’s not done right, we return and make it right at no charge. That’s documented on the terms page, not buried in an asterisk. Every visit also includes a photo record as standard, so you see what we found in the wall and what we did about it.
We also offer a free second opinion on any written estimate. Bring a competitor’s quote and we’ll review it line by line and tell you whether the substrate step and the vent retrofit are in there. A lot of the quotes we review aren’t.
Common Local Scenarios We Walk Into
Hialeah’s housing stock shapes these jobs in ways that don’t show up on a national cost chart. Most homes here are 1950s to 1970s concrete-block and CBS single-family houses on small lots, many with an enclosed carport or patio that’s been converted along the way, and not always with a permit. When a bathroom backs onto an enclosed carport, uncovering the wall can mean dealing with unpermitted prior work, and any new remodel has to bring it into compliance. That’s a Miami-Dade permitting conversation, not a materials problem, and we plan for it before the tile comes off.
Multigenerational households add another layer. A remodel often happens because a family member is moving in and the bath has to serve more people, which is when a tub-to-shower conversion at $3,500 to $10,000 or a walk-in shower at $4,500 to $12,000 makes more sense than a like-for-like replacement. The geometry of a 1960s Hialeah bath is tight, and a careful layout sometimes does more for the space than a higher budget does. We work through that with you before quoting.
FAQs
Most Hialeah bathroom remodels land between $9,000 and $28,000, with small bathrooms at $5,000 to $12,000 and full gut jobs with a layout change at $28,000 to $52,000. Call (888) 836-5914 for a flat written price - estimates are free.
Repair usually wins for a single failing fixture; replacing a $150 toilet that keeps failing in Hialeah’s hard water costs more over time than specifying a $500 to $1,400 Toto up front. Once tile removal exposes an unwaterproofed substrate, though, the repair math shifts toward a full retile, since the wall has to be rebuilt either way. Call (888) 836-5914 and we’ll tell you which side you’re on after a look.
Yes. We answer calls 24/7 with a live person, and we can get an estimate scheduled quickly for bathroom projects across Hialeah. Every quote is a flat written price with a written scope and warranty. Call (888) 836-5914 for a free estimate.
Often because the substrate remediation and the vent retrofit weren’t in the original number. Removing 1960s tile from a CBS wall usually reveals a surface that has to be rebuilt ($1,200 to $3,500) before new tile can be set, and that step belongs in the first quote, not a change order. Call (888) 836-5914 for a full written scope up front.
Get Your Written Price Before You Pick a Tile
The bathroom budget you can actually plan around starts with a number in writing, including the substrate work and the vent. Call (888) 836-5914 for a free estimate on your Hialeah remodel. Free second opinion on any written estimate, upfront flat pricing, and a 365-Day Done Right Promise behind every job. Learn more on our home page.
Written by the team at Rowan Construction Group Hialeah, serving Hialeah, FL.
What Our Customers Say
"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O."Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."
- Malcolm T.












