







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Kitchen Remodel Costs in Hialeah, FL - And the Two Decisions That Set the Number
A kitchen remodel in Hialeah typically runs $22,000 to $110,000 depending on scope, with most full gut projects landing between $38,000 and $65,000. The single biggest swing factor in a Hialeah CBS home isn’t the cabinets or the counters - it’s whether you move the plumbing stack and whether you open the block wall to the living room. Both decisions need to be made before design is finalized. Call Rowan Construction Group Hialeah at (888) 836-5914 for a written price before anything else happens.
Hialeah is dense, Spanish-first, and built mostly on 1950s-1970s concrete-block single-family homes on tight lots. Multigenerational households here tend to add on rather than move. That shapes kitchen budgets in ways a Miami condo remodel never sees: crews are working around original terrazzo floors, converting carports into in-law suites, and routinely bringing unpermitted prior work into compliance while they’re inside the walls anyway.

Why the CBS Wall and the Plumbing Stack Decide Your Price
In a typical 1960s Hialeah CBS kitchen, the plumbing stack is cast into the concrete-block exterior wall, not tucked inside an interior partition like you’d find in wood-frame construction. That one fact changes everything downstream. Moving the sink to an island or relocating it across the room means saw-cutting the slab, rerouting the drain, and patching - a job that runs $4,500 to $9,000 and is almost never itemized in a kitchen remodel estimate until the floor is already open. When we see a competitor’s quote with no line for slab work, that’s the first thing we flag in a free second opinion.
The second quiet decision is the wall between the kitchen and the living area. Opening that in a Hialeah CBS home isn’t a drywall cut - it means removing a load-bearing concrete-block wall, pouring a concrete beam or installing a structural steel header, and getting engineer-stamped drawings for the Miami-Dade permit package. That step costs $6,000 to $14,000. It belongs in the upfront written quote, not a change order as demolition begins.
What to look for in a written quote
- A plumbing relocation line, in dollars. If the layout moves the sink, there should be a stated number, not “TBD.”
- An engineer-stamped drawing line if any wall opens. In Hialeah, structural openings on CBS walls need this in the Miami-Dade permit package.
- Named cabinet brands with lead times. “Cabinets TBD” or a full-kitchen cabinet allowance under $8,000 will not hold. Our specs are KraftMaid semi-custom (8-10 week lead) and Wellborn full-custom (10-14 week lead).
- Countertop material named with installed price per linear foot. We install Cambria quartz at $85-$115/linear ft and Caesarstone at $75-$105/linear ft - both carrying the Florida product approval (NOA) that cheap laminates don’t. In South Florida humidity cycling, that laminate delaminates inside three to five years.
- The Miami-Dade permit number and final inspection sign-off in writing if plumbing or electrical is being moved.
Hialeah Kitchen Remodel Cost by Scope
Three tiers cover almost every Hialeah kitchen we quote. The range below reflects the city’s housing stock and the permit reality of working on CBS homes.
| Scope | Typical Hialeah Cost | What’s included |
|---|---|---|
| Cabinet-and-countertop refresh, no layout change | $22,000-$38,000 | Cabinets, counters, backsplash, fixtures; plumbing and electrical stay put |
| Mid-level gut, new layout, same plumbing locations | $38,000-$65,000 | Full tear-out, new finishes, layout shifts that don’t move the stack |
| Full gut, island addition, plumbing relocation | $65,000-$110,000 | Slab saw-cut and reroute, structural wall opening, engineer drawings, island |
Line items also come in on their own. Cabinet installation runs $4,000-$13,000; countertop installation $2,000-$6,500; backsplash $800-$2,500; kitchen island installation $3,000-$10,000. A small kitchen remodel stays in the $9,000-$20,000 band. For a deeper walkthrough of everything inside a kitchen build, see our Kitchen Remodeling page.

Permits and Product Approvals: The Part Owners Ask About Most
Does a Hialeah kitchen remodel need a permit? Yes - any kitchen remodel that moves plumbing or electrical requires a full Miami-Dade permit with inspections. There isn’t a shortcut. Ask for the permit number and the final inspection sign-off in writing; we build that into the documented photo record on every visit, so the homeowner has compliance proof on file rather than a verbal “it’s all permitted.”
Product approval matters too. Between hurricane-season wind-load rules and the humidity cycling that eats cheap finishes, we only spec materials that carry Miami-Dade NOA compliance. Grohe and Sterling fixtures, for example, pass that bar and hold up to hard water and daily use in a way builder-grade substitutes don’t.
Kitchen Remodel Cost Questions Hialeah Homeowners Actually Ask
How much does a kitchen remodel cost in Hialeah?
A kitchen remodel in Hialeah runs $22,000-$38,000 for a cabinet-and-counter refresh, $38,000-$65,000 for a mid-level gut without plumbing moves, and $65,000-$110,000 for a full gut with an island and a plumbing relocation. The relocation is the biggest single variable. Call (888) 836-5914 - estimates are free and the price comes in writing.
Can you open up the wall between my Hialeah kitchen and living room?
Yes, and it costs $6,000-$14,000. On a Hialeah CBS home that means removing a load-bearing block wall, installing a structural beam or header, and getting engineer-stamped drawings into the Miami-Dade permit package. We put that number in the written quote up front, not a change order mid-demolition. Call (888) 836-5914 for a free second opinion on any estimate you’ve been given.
Is it cheaper to repair my cabinets or replace them?
Replacement usually wins in Hialeah homes with original 1960s cabinet boxes. Refacing a warped or water-damaged box looks briefly newer, then fails. New KraftMaid or Wellborn cabinets run $4,000-$13,000 installed and outlive the house’s next two owners. Call (888) 836-5914 and we’ll price both options side by side.
Can I get a written price before work starts?
Yes - every Rowan Construction Group Hialeah project gets a flat written price and written scope before anyone picks up a tool. No change proceeds without a signed change order. That discipline is why projects finish within a few percent of the agreed number. Estimates are free at (888) 836-5914.
Bring Us Any Written Estimate
If you’ve already gotten a kitchen quote in Hialeah, we’ll review it line by line at no charge - the plumbing relocation, the wall opening, the cabinet allowance, the permit line. If a number is missing, we’ll say so. Call (888) 836-5914 for a free written estimate. Under the 365-Day Done Right Promise, if it isn’t done right, we make it right.
Written by the team at Rowan Construction Group Hialeah, serving Hialeah, FL.
What Our Customers Say
"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O."Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."
- Malcolm T.












