







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHome Additions & ADU Near You in Hialeah, FL
Home additions and ADU work in Hialeah, FL typically runs $118,000 to $310,000 for a full build, and a detached accessory dwelling unit usually lands between $165,000 and $340,000 depending on size and site. We serve homeowners across Hialeah and the surrounding neighborhoods who want a written price before anyone picks up a tool. Call (888) 836-5914 for a free estimate, and a live person answers, day or night.
This page is the “near me” starting point. If you already know you want the full scope breakdown, the Home Additions & ADU in Hialeah page covers design, permitting, and the build sequence in detail. If you’re just figuring out whether an addition makes sense for your lot on West 49th Street or off Palm Avenue, keep reading here.
Key Takeaways
- Written flat price before any work starts, on every addition and ADU job, no exceptions.
- No change proceeds without a signed change order. That’s Clause 1 of the Haven Standard, and it’s why projects finish within a few percent of the agreed number.
- Background-checked, uniformed technicians. Documented photo record on every visit, included as standard.
- Our technicians have up to 19 years of experience on additions and ADU builds.
- 365-Day Done Right Promise: if it isn’t done right, we make it right.

Fast, Local Home Additions & ADU
Speed here means the paperwork moves first, because in Miami-Dade County the permit is the long pole. We get a written scope and flat price to you before a crew ever mobilizes, then we start the permit submittal while you’re reviewing the number. Most Hialeah homeowners have a written estimate within a few business days of the site walk, and the site walk itself usually gets scheduled within the week.
We cover Hialeah proper and the tight ring around it: Miami Springs, Opa-locka, Westview, West Little River, Gladeview, Brownsville, and Pinewood. If your address sits inside that ring, we’re close. That matters for inspections, for material delivery, and for the small mid-project questions that get resolved faster when someone can actually drive over.
Every visit, including the first site walk, comes with a documented photo record. You’ll see the condition of the existing slab, the tie-in point for the new roofline, and the setbacks we measured. It’s evidence, not a sales pitch. And if you already have a written estimate from another contractor, bring it. Our Free Second Opinion reviews it line by line at no charge.
What Drives the Cost of an Addition in Hialeah
Hialeah sits on the same limestone and high water table as the rest of eastern Miami-Dade, and that shapes the number more than most homeowners expect. A room addition over an existing slab is one budget. A new detached ADU that needs its own foundation, its own impact-rated windows to meet Florida Building Code wind requirements, and its own utility trench is another entirely. We name these costs on the page so you can compare honestly.
| Scope | Typical range in Hialeah |
|---|---|
| Single-room addition (200-350 sq ft) | $118,000 – $175,000 |
| Primary suite addition (400-600 sq ft) | $185,000 – $260,000 |
| Attached ADU / in-law suite | $165,000 – $255,000 |
| Detached ADU (garage conversion or new build) | $195,000 – $340,000 |
| Impact windows and doors, per opening | $1,900 – $4,200 |
An ADU (accessory dwelling unit) is a self-contained living space with its own entrance, kitchen, and bath. An in-law suite is the same idea but shares a wall and sometimes a utility line. Both add value in Hialeah’s rental market, and both have to clear the same setback and lot-coverage rules. We’ll tell you which one your lot can actually hold before you spend a dollar on design.

Areas We Cover
We build additions and ADUs throughout Hialeah and the neighborhoods that share its building stock and its lot patterns. If you’re in Miami Springs, Opa-locka, Westview, or West Little River, we’re a short drive from your site. Same for Gladeview, Brownsville, and Pinewood. The 0.15-acre lots common in Brownsville and Gladeview often rule out a detached ADU but work fine for an attached suite, and we’ll say so plainly at the site walk rather than after a design deposit. For roofing tie-ins on these additions, our home page lists the full set of trades we handle, including the GAF and Owens Corning shingles we use to match an existing roof.
Why Homeowners Here Want a Written Number First
You’ve seen the version of this process where a contractor gives a range, the range drifts, and by framing day you’re paying 30% over a number nobody wrote down. We don’t work that way. Under Clause 1 of the Haven Standard, the price is written before anyone starts. The quote is a flat price with a written scope and a written warranty. “Call for a quote” isn’t an option on our side.
When a change is genuinely needed, work stops until the change order is signed. That discipline is why Rowan’s projects finish within a few percent of the number the customer agreed to, across more than 4,000 jobs since 2007. It’s also why background-checked, uniformed technicians show up with a live person answering the phone 24/7 behind them. No urgency theatre. No “only two slots left this week.” Just a number, a scope, and a photo record you can hold onto.
Frequently Asked Questions
How fast can work start on a home addition in Hialeah?
A written estimate usually reaches you within a few business days of the site walk, and permitting with Miami-Dade County and the City of Hialeah typically runs 8 to 16 weeks depending on scope and whether impact windows and flood elevation come into play. The build itself is measured in months, not weeks. We start the permit package while you’re reviewing the price so nothing stalls. Call (888) 836-5914 to get the site walk on the calendar, free of charge.
Do you serve my neighborhood?
Yes, if you’re in Hialeah, Miami Springs, Opa-locka, Westview, West Little River, Gladeview, Brownsville, or Pinewood. Those are the areas we cover. If you’re just outside that ring, call and ask; a live person answers 24/7 and can tell you in a minute. Estimates are free and there’s no pressure to book the second you call.
What does an ADU cost in Hialeah, and is it cheaper to convert a garage or build new?
A garage conversion ADU in Hialeah usually costs less than a new detached build because the foundation, roof, and utility stubs already exist, typically landing in the $165,000 to $235,000 range versus $195,000 to $340,000 for new construction. The catch is ceiling height, slab condition, and whether the existing garage meets current wind-loading and flood requirements. We check all three at the site walk and put the honest number in writing. Call (888) 836-5914 for the exact figure on your lot.
Can I reach someone after hours if I have a question mid-project?
Yes. A live person answers calls 24/7, not a voicemail box, and every visit includes a documented photo record so you can see what happened even when you weren’t home. If a question comes up on a Sunday, someone picks up. For additions and ADU work specifically, the fastest way to get numbers is to call (888) 836-5914 and ask for a free estimate; we’ll schedule the site walk before we hang up.
Start With the Number
Additions and ADUs are the biggest checks most Hialeah homeowners ever write, and the fair way to start is with a written price and a written scope in hand before a single pallet of block shows up. We’ll bring the photo record, we’ll flag the lot constraints, and we’ll sign the change order before any change begins. Call (888) 836-5914 for a free estimate, and if you have a competitor’s quote, hand it over. The second opinion costs nothing.
Written by the team at Rowan Construction Group Hialeah, serving Hialeah and nearby areas.
What Our Customers Say
"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O."Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."
- Malcolm T.












