







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Miami Gardens
Adding on to a Miami Gardens home is a permitting and engineering job before it’s a construction job. Most of the houses here are 1950s-70s concrete-block (CBS) ranches, and anything you build on them has to clear Miami-Dade County’s High Velocity Hurricane Zone (HVHZ) rules: product approvals, tie-downs, impact-rated openings. We scope all of that before we quote, so the number you sign is the number you pay. Call (888) 836-5914 to book a free estimate on your addition or ADU.
Why Rowan Construction Group Hialeah Is Miami Gardens’s Preferred Home Additions & ADU Company

Rowan Construction Group has delivered 4,000-plus projects under The Haven Standard, and since 2007 no job has moved on a change until the change order was signed. That discipline matters in Miami Gardens, where an addition can run $53,100 to $153,400 and a detached ADU $106,200 to $259,600 – a project where one missed tie-down retrofit or septic setback can swing the cost by five figures.
Every project gets a flat written price and written scope before anyone picks up a tool. Under Clause 1 of the Haven Standard, the price comes before the work, not after. If something in the existing block wall or roof-to-wall connections turns out worse than the walk-through showed, you get a signed change order to review, not a surprise line item at the end. Our crews are background-checked and uniformed, a live person answers calls 24/7, and each visit includes a documented photo record as standard.
We know the corridors of 33056, the flat lots off Northwest 27th Avenue and the 199th Street side of town, the carports and converted garages that never got a final inspection. Bring us any written estimate for an addition or ADU and we’ll review it line by line at no charge through our Free Second Opinion offer.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Miami Gardens
The biggest variable in a Miami Gardens addition isn’t the new square footage – it’s what the existing house forces you to fix first. Here’s how the main paths break down.
ADU Design & Permitting
An accessory dwelling unit (ADU) is a self-contained second home on the same lot – kitchen, bath, sleeping area, its own entrance. In Miami Gardens that means Miami-Dade County HVHZ approvals on the design, not just a city building permit, and product approval paperwork for every impact-rated window and door. We handle the drawings, the county submittal and the inspection calendar so the shell isn’t sitting finished-but-unpermitted.

Garage Conversion ADU
Most Miami Gardens garages were built as carports or single-car bays off a CBS ranch, and many were converted informally over the years. Turning one into a legal ADU ($35,400 to $94,400) means addressing the slab, the tie-downs, the wall connections and the non-conforming layout before the permit will clear. We scope the upgrade, not just the finish.

New Detached ADU
A detached ADU is a separate structure on your lot – often over a garage or on an open side yard. On Miami Gardens’s larger parcels that can mean long material hauls, tight equipment access between existing structures, and sight-line and drainage grading across an open lot. New ADU construction here runs $106,200 to $259,600 depending on size and utility routing.

Junior ADU & Interior Conversion
A junior ADU is a smaller unit carved from existing interior space – a converted den, a bedroom suite with its own kitchenette. It draws less site work than a detached build but still needs an egress path, a wastewater connection, and county sign-off on the added living area. We quote the interior conversion with the same written scope and price as a full addition.
Trusted Brands We Service in Miami Gardens
Finish and structure choices on a Miami Gardens addition run through brands we know and source: Belgard for hardscape and driveway transitions, Bufftech and ActiveYards for fencing and enclosure work, and Jerith for aluminum fencing. We don’t hold parts or materials locally – our independent local professionals source what each job specifies and turn it around on the project schedule. Because the quote names the brand and spec up front, the pricing you sign reflects the material actually going on the wall, not a placeholder.
Common Home Additions & ADU Problems We See in Miami Gardens Homes
- Assuming the city permit is enough. Miami-Dade County HVHZ approvals are required for any addition here, and skipping them stalls inspection sign-off. Contractors from Broward routinely underestimate this.
- No tie-down retrofit before framing. Older 1950s-70s CBS homes along the 33056 corridors often need roof-to-wall tie-downs upgraded before a new structure can pass. That belongs in the scope from day one.
- Ignoring septic and well setbacks on larger lots. An ADU or back addition staked too close to a septic field or well can force a redesign or a change order after the foundation is laid out. We check setbacks before we draw.
- Undercounting haul distance and equipment access. Open lots mean long material runs and tight equipment paths; when that isn’t scoped, it turns into an overrun nobody priced. We measure access on the walk-through.
Here’s how a typical Miami Gardens addition goes. A homeowner wants to expand a 1960s CBS ranch for a growing family. The contractor finds the existing block walls lack modern tie-downs and the roof-to-wall connections aren’t HVHZ-compliant. Before any new square footage is framed, the scope has to include a tie-down retrofit and likely a roof deck upgrade, all permitted through Miami-Dade County with impact-rated openings specified. The final punch list often adds drainage improvements, because the flat lot and heavy summer rains can pool water against the new foundation.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Miami Gardens, FL

Real numbers, before anyone picks up a tool. In Miami Gardens, a room addition typically runs $53,100 to $153,400, a detached ADU $106,200 to $259,600, and a garage conversion ADU $35,400 to $94,400. What pushes a job toward the top of a range: HVHZ tie-down and roof deck upgrades on the existing CBS shell, impact-rated openings, long material hauls and equipment access on open lots, and drainage or grading work the flat site demands. What keeps it low: a straightforward footprint, setback-friendly siting for the ADU, and existing structure that already clears county inspection.
| Scope | Typical Miami Gardens Range |
|---|---|
| Home Addition | $53,100 – $153,400 |
| ADU Construction | $106,200 – $259,600 |
| Garage Conversion | $35,400 – $94,400 |
Every quote is a flat written price with a written scope and a written warranty – “call for a quote” isn’t how we work. Book a free estimate and we’ll put the number on paper.
We Also Serve Cities Near Miami Gardens
The same HVHZ-driven addition and ADU work applies across our Home Additions & ADU in Miami Gardens service area, including Opa-locka and Golden Glades just east and south, and Pinewood and Westview to the immediate west and north. If your lot sits on the county line between these neighbors, county permitting rules still govern the build – and we scope them the same way. Reach our Home Additions & ADU team for an estimate anywhere in and around Miami Gardens.
Serving Miami Gardens, FL – Our Local Coverage Area
We serve Miami Gardens and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Miami Gardens

Yes. Any addition or ADU in Miami Gardens requires Miami-Dade County permitting under the High Velocity Hurricane Zone rules, not just a city permit. That means product approvals, HVHZ-compliant openings and tie-downs, and county inspection sign-off. We handle the submittal and inspection calendar. Call (888) 836-5914 for a free estimate that includes the permitting scope.
Septic and well setbacks limit where an ADU or addition can sit, and staking before you check them can force a redesign or a change order after the foundation is set. On open Miami Gardens lots we identify the setback lines before we draw. We scope it up front so the site plan and the price agree. Call (888) 836-5914 to schedule a free site review.
A tie-down retrofit means upgrading the connections that hold your roof to the walls and the walls to the foundation so the existing CBS shell meets HVHZ wind-load requirements before an addition is framed. On a 1960s Miami Gardens ranch the original connections usually don’t comply, so it belongs in the scope from the start. Call (888) 836-5914 for a quote on your addition that includes the retrofit.
Storm season shapes scheduling, not whether the job happens. We plan framing, roof deck and impact-opening installation around the June – November window, sequence the site so water doesn’t pool against a new foundation, and keep the photo record updated each visit. The written scope and price stay fixed through the seasonal staging. Call (888) 836-5914 to book a free estimate.
Yes, a garage conversion ADU is doable in Miami Gardens, typically $35,400 to $94,400. Many garages here started as carports or informal conversions, so the job includes bringing the slab, tie-downs, wall connections and layout up to county HVHZ code before the permit clears. Call (888) 836-5914 for a free estimate on your conversion.
Get Your Written Price on an Addition or ADU in Miami Gardens
An addition or ADU in Miami Gardens is a county-permitted, HVHZ-engineered project, and the honest way to start is a walk-through and a flat written price before anyone picks up a tool. Under The Haven Standard, no work moves without a signed change order, each visit brings a documented photo record, and our technicians – up to 19 years of experience – are background-checked and uniformed. Call (888) 836-5914 for a free estimate, and bring any competing written quote for a free line-by-line second opinion.
Written by the team at Rowan Construction Group Hialeah.












