







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Miami
Additions and accessory dwelling units (ADUs, or the detached second homes that Florida code now allows on many lots) are how Miami households add usable square footage without crossing the causeways. We build them for homeowners in ZIP codes 33163, 33158, 33128, and 33130, and across neighborhoods where space is tight and the storms are real. Our technicians have up to 19 years of experience, every job comes with a flat written price before a shovel moves, and when you call for a free estimate a live person answers. While most general contractors in Miami talk timeline, we start with a harder question: what the air and the county will do to your building over the next twenty years. The answer decides the materials, and the materials decide the price.
Our crews are background-checked and uniformed. The Home Additions & ADU services we offer are quoted with a written scope and a written warranty, and no change proceeds without a signed change order. That last discipline is why our projects land within a few percent of the number the customer agreed to. Call (888) 836-5914 to schedule yours.
Why Rowan Construction Group Hialeah Is Miami’s Preferred Home Additions & ADU Company

Here’s the failure we see most in Miami-Dade County addition work, and it rarely shows up on an inspector’s radar: the fasteners and flashing were specified for a dry market, the salt air chewed through the galvanized hardware within six or seven years, and by the time the owner smells the leak the stucco has to come off. A written price is only honest if the spec behind it survives this climate. That’s where we start.
We’re a construction contractor working under The Haven Standard, and the discipline of that standard is documented: over 4,000 projects delivered, every one with a written price before work started and a photo record of what was found and what was done when the crew left. It’s project record as a deliverable, not a recap over the phone.
Miami neighbors compare contractors the way they compare appliances, so we put numbers on the page. Our 365-Day Done Right Promise is printed on every quote and backed by a terms page, not an asterisk. Background-checked, uniformed technicians show up, and someone live answers the phone 24/7.
Bring us another contractor’s estimate for a home addition and we’ll read it line by line at no charge. That offer covers your whole Home Additions & ADU in Miami project, and customers who use it tend to catch the inland-spec line item before it becomes a change order.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Miami
ADU Design & Permitting
An ADU is a self-contained second dwelling on the same lot, and in Miami-Dade the permit path is where budgets get quietly rewritten. Your recertification file (40-year, and 50-year in some cases), your impact glazing requirements, and your setback come together in the same submittal, and the design has to account for all of it. We price the design and permitting scope in writing before it begins so the number you see is the number you sign.

Garage Conversion ADU
Converting a garage is the least expensive path to a legal ADU, and in Miami it’s where we find the most surprises. The existing slab may not be elevated for flood, and the garage’s cinder-block walls have no cavity to run insulation or hurricane straps through. A garage conversion here usually runs $35,400 to $94,400 depending on how much structural and mechanical retrofit the shell needs.

New Detached ADU
A detached unit is a new building with its own foundation, its own roof, its own impact-rated opening. In Miami, the wind-load requirements and the marine-grade finishes the salt air demands are part of the base cost, not an upgrade. Detached ADU construction typically runs $106,200 to $259,600 depending on the footprint, the utility distance from the main structure, and the roof assembly.

Junior ADU & Interior Conversion
A junior ADU is a smaller attached unit, usually carved from existing interior space, sometimes within the main dwelling. It’s the fastest approval path, but the existing cinder-block walls in a 1950s ranch home often force surface-mounted retrofit rather than in-wall install. The scope has to show that transition clearly or it’ll surface later as a change order.
Room Additions, Second Story Additions, Sunrooms & Enclosed Patios
Room additions extend the footprint at grade. Second story additions go up, and in Miami the footing capacity and the lateral bracing matter more than the finish list. Sunrooms and enclosed patios are a lighter build but on the same principle: the roof assembly and the impact-rated glazing have to hold under hurricane-season wind load. A room addition typically runs $53,100 to $153,400; a second-story addition sits at the high end of that range.
The Miami Factor: Why Salt Air and Recertification Set the Price

Miami is ground zero for the 40-year recertification process, extended to 50 years for some buildings, and essentially no other U.S. city mandates structural inspections with that recurring schedule. What it means in practice is that every addition or ADU on a property older than the trigger age has to be designed to coexist with mandated concrete restoration, impact glazing, and life-safety retrofits. Those aren’t optional. They’re sequenced into the same permit calendar as your project. If the contractor priced the addition without reading the recertification file, the scope gap shows up mid-build.
The salt air and subtropical marine climate are the other half of it. Year-round high humidity, salt-laden wind, and intense UV chew through ordinary galvanized fasteners, generic window frames, and standard paver joint sand. The right spec for Miami uses stainless or hot-dip galvanized hardware at every penetration, marine-grade sealants and finishes, and impact-rated assemblies at every opening. That coastal spec typically adds 8 to 14 percent to the line-item material cost over the inland version, and it’s the reason a cheap bid is often the more expensive number within a decade.
In Little Havana and Little Haiti, crews routinely open a wall and find original cinder-block with no cavity. Hurricane straps and insulation have to be furred out or surface-mounted before anything load-bearing gets attached. That’s slower and more careful than a wood-frame addition on an inland lot, and it has to be inspected before stucco goes back on. Any written price that doesn’t show that step is missing a real cost.
Trusted Brands We Service in Miami
We don’t stock parts. We specify from a vetted library of fifty-plus material brands and price what’s actually specified, which keeps the number honest rather than inflated. In a Miami addition that library matters: Belgard pavers for the patio and hardscape, with sealed joints and a salt-resistant finish, not the builder-grade that fades by year four. Where an exterior enclosure calls for fence or railing, we spec Bufftech and Jerith so the finish holds against the marine air rather than corroding at the fasteners. Roof-facing additions use GAF or Owens Corning assemblies with the correct Miami-Dade wind rating, paired with stainless fasteners at every connection. When a quote names a brand and explains why, you can check it.
Common Home Additions & ADU Problems We See in Miami Homes
- Corroded fasteners and flashing from salt air. Ordinary galvanized hardware fails within six to ten years on the coastal side of the county, and the first symptom is a leak at the roof-to-wall junction your addition ties into. We spec stainless or hot-dip at every penetration and seal it with marine-grade sealant so the change order never becomes a rain event.
- Cinder-block walls with no cavity. Popular in the post-WWII housing stock (the 1950s ranch homes across Miami’s older neighborhoods), these walls make in-wall insulation and hurricane strapping tricky. If the fastening system isn’t worked out before framing, the rough-in fails inspection and the stucco has to come back off.
- Recertification scope expanding the project. If your property is due for 40-year (or 50-year) recertification, mandated concrete restoration and impact glazing have to be coordinated with the addition’s permit and draw schedule. Priced upfront, it’s a line item. Discovered mid-build, it’s a stalled job.
- Garage slab elevation and moisture. Converting a garage means the existing slab may sit below the finish-floor elevation and trap moisture, and the door opening is now a wall that has to be built airtight and hurricane-rated. We test and re-spec before the design is finalized.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Miami, FL
A home addition in Miami runs $53,100 to $153,400 for a livable room addition, and a second-story addition sits at the upper end because of footing and bracing work. A detached ADU is $106,200 to $259,600. A garage conversion is $35,400 to $94,400. Those ranges reflect the coastal spec (stainless and hot-dip hardware, marine-grade finishes, impact-rated openings) and the recertification coordination where it applies. The inland equivalent of the same square footage typically runs 8 to 14 percent lower on materials, and the cheap version costs more within a decade. Every Rowan quote is a flat written price with a written scope and a written warranty, so you can compare the spec line by line against another contractor’s number. Call (888) 836-5914 for a free estimate.
| Service | Miami Price Range |
|---|---|
| Home Addition | $53,100 – $153,400 |
| ADU Construction | $106,200 – $259,600 |
| Garage Conversion | $35,400 – $94,400 |
We Also Serve Cities Near Miami
We work throughout the surrounding communities: Brownsville, Gladeview, West Little River, and Miami Springs. The salt-air spec and the recertification consideration apply the same way in each, with the recertification trigger varying by building age and the coastal exposure varying by distance from the bay. Call (888) 836-5914 to schedule a free estimate at your address.
Serving Miami, FL – Our Local Coverage Area
We serve Miami and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Miami
Miami’s additions cost more because the salt air forces coastal-grade hardware and finishes: stainless or hot-dip galvanized fasteners at every penetration, marine-grade sealants, and impact-rated glazing at every opening. The coastal spec typically adds 8 to 14 percent to the material line over an inland build. When you factor in that ordinary hardware would need replacement within six to ten years, the cheap version is the more expensive one. Call (888) 836-5914 for an exact quote on the coastal spec – estimates are free.
Miami-Dade’s 40-year recertification (and the 50-year for some buildings) requires that mandated concrete restoration, impact glazing, and life-safety retrofits be coordinated with your ADU’s permit and draw schedule. The recertification items can’t be ignored in the scope; they run alongside the new work. If your contractor didn’t price them upfront, they surface later as change orders. Call (888) 836-5914 for a free estimate that shows the full scope in writing.
Yes, and it’s common in Miami’s older neighborhoods, but the design has to account for the no-cavity cinder-block walls. Insulation and hurricane straps are surface-mounted or furred out rather than run in the wall cavity, and the rough-in is inspected before stucco goes back on. That sequencing is part of the base scope, not a surprise. Call (888) 836-5914 for a free estimate and we’ll walk the wall condition with you.
A garage conversion in Miami-Dade requires a building permit for the structural change, an electrical and plumbing permit if you’re adding kitchen or bath fixtures, and compliance with the local flood elevation rules if the slab needs raising. If your property is in the 40-year recertification window, the conversion scope has to align with that file. We pull the permits and pass the inspections as part of the written price. Call (888) 836-5914 to schedule the free estimate.
The way to avoid change orders on a Miami addition is to price the coastal spec and the recertification scope upfront, then require a signed change order before any change proceeds. At Rowan, that discipline is Haven Standard Clause 1: the price is written before anyone starts, and no work moves on a change until the change order is signed. That’s why our projects finish within a few percent of the number agreed. Call (888) 836-5914 for a free estimate and a written scope.
Get a Written Price for Your Miami Addition or ADU

Additions and ADUs are long builds and the wrong spec gets expensive slowly. Bring us your plans, or the plans you’re still shaping, and we’ll give you a flat written price with a written scope and a written warranty before anything starts. Call (888) 836-5914 for a free estimate, and if you already have another contractor’s number, we’ll read it line by line at no charge. The 365-Day Done Right Promise is on every quote. We’re glad to work with you across Miami.
Written by the team at Rowan Construction Group.












